Manual and Mechanical Warewashing Equipment Chemical Sanitization-Temperature pH Concentration and Hardness (P)
Inspector’s comment: Low temperature dish machine has not been fully installed Sanitizer dispenser at the 3 bay sink has not been fully installed Finish installation to ensure chlorine in the low temperature dishwasher is maintained at 50-100ppm and the quats sanitizer at the 3 bay sink is maintained at 200-400ppm
Finding status dated Jun 13, 2024.